What the survey covers
The visit looks at the consumer unit, the capacity of the supply, the route from that board to the parking place, and how the cable is fixed along the wall or across the drive. The quote lists the charger, the electrical materials, and the labour. If the supply needs work before a charger can be added, that work is written in the same quote.
Where the house also has solar PV, or you want solar priced at the same time, the survey can look at both. They stay separate lines in the quote. The solar scope is on solar panels. A battery, if you want storage priced, is on battery storage. The longer charger note is home EV charging in Edinburgh.