Commercial rooftop solar in the Lothians: from survey to switch-on

If you run an office, workshop, unit or farm, you might be wondering what a rooftop solar project actually involves. Here's how a typical project runs, step by step.

1. Data review

Half-hourly electricity data or recent bills show how much power you use and when. Daytime demand is what makes rooftop solar work for a business.

2. Roof and site survey

We check the roof structure, its condition and remaining life, access, shading, and your electrical supply and switchgear.

3. Design and fixed written quote

The system is sized to your load, not to fill the roof for the sake of it.

4. Grid application (G99)

Larger systems need approval from SP Energy Networks before they connect. The network operator may approve the system as designed, set an export limit, or ask for network work. Allow weeks, sometimes longer.

5. Permissions

You'll need landlord consent if you lease the building. Some properties also need planning or building checks.

6. Installation and handover

The quoted work is carried out to the agreed date. At handover you get the documentation, along with the monitoring set-up.

VAT and tax

The 0% VAT rate on solar is for homes. Ask your accountant how VAT and capital allowances apply to your business.

Next step

FAQs

How long does a commercial solar project take?

It depends mostly on the grid application and any permissions, so allow weeks to months.

Do I need my landlord's permission?

Usually, if you lease the building.

Does 0% VAT apply?

The 0% rate is for homes. Ask your accountant about business VAT treatment.

Pentland Renewables surveys the property, sends a written quote, and arranges the work.

Get my quote

Send the form with your postcode and what you want priced. We survey your home, then send the written quote. You decide after you have read it.

Blog
Get my quote